WIRE Latest Info

October 20, 1997


The flight structure completed qualification testing on October 10. This testing included loads, random vibration, and shock tests.

The flight harness was installed on the spacecraft October 17. Here is the harness lead, Bahe Rock, during the installation.

The spacecraft power electronics and spacecraft computer will be integrated this week.