WIRE Latest Info

December 5, 1997


This week we continued with attitude control system testing. Currently the SPE, shunt box, SCS, transponder, WIE, the ACE, the digital sun sensor, the gyros, the torquer bars, and the reaction wheels are fully integrated.

Here is the spacecraft as it now looks. The test connector panel is now installed. The magnetometer is on the boom which sticks well above the upper deck. The magnetometer is surrounded by test coils which produce a known magnetic field. The spacecraft equipment panels are made of graphite composite bonded in a rib pattern for strength. The panels are painted white as part of the temperature control for the electronics.

In the left photo, Ken Barnes oversees the ACS software tests as Cheryl Albert controls the spacecraft. In the right photo, John Classen and Joe Baros prepare equipment for next week's RF compatibility test. The compatibility test verifies that the ground systems will be able to communicate with the spacecraft.

Next week we will run ACS dynamic simulations and the RF compatibility test.


Goddard WIRE homepage

Previous updates:

August 18, 1997
October 20, 1997
October 31, 1997
November 7, 1997
November 14, 1997
November 21, 1997